Operating Layer 6 & Layer 7 — the two newest layers of the marketing stack. Request intake →
Process From intake to mature operations Retainer-only · 6-month minimum

The operating runbook.

How a LayerSixSeven engagement actually runs. From intake call to mature monthly operations — in five phases.

§ 00 · wk -2 to 0
Intake. Qualification, intake call, proposal, decision. No fee.
§ 01 · wk 1–4
Activation. Baseline Audit, registry, schema, first operating plan.
§ 02 · mo 2–6
Operations. Monthly + quarterly rhythm. Citation engineering.
§ 03 · mo 6+
Renewal & review. QBR, renewal, scope expansion or sunset.
§ 04 · yr 2+
Mature engagement. Layer 7 work, annual reviews, compounding.
§ 00 · Pre-engagement

Intake.

Phase spec
DURATION1–2 weeks
COSTNone
COMMITMENTOne call

Before an engagement begins, we run a structured intake — a short, focused conversation that determines whether the engagement is the right fit for both sides. We work with a small roster by design. Intake is the qualification step, not a sales pitch.

  • Day 0 · Inbound & qualification. Category fit, scale, buying authority, engagement readiness. We don't proceed with every brand that asks.
  • Week 1 · Intake call (45 min). Working session with the founder — map the stack, identify the Layer 6/7 surface, align on scope. No deck, no pitch.
  • Week 1–2 · Proposal & scoping. Scoped engagement proposal — retainer level, term, surface coverage, what the Month 0 Audit will cover. Indicative investment range.
  • Week 2 · Engagement decision. Both sides decide. Contracts executed and Activation begins, or no obligation — we stay in touch.
§ 01 · Weeks 1–4

Activation.

Phase spec
DURATION4 weeks
CADENCEWeekly working sessions
OUTPUTOperational baseline + Q1 plan

The first month after engagement signs. The objective is to move from diagnostic to operational footing — registries built, baseline measured, infrastructure deployed, and a quarterly plan that runs the next 90 days. By end of Week 4, the studio is operating, not onboarding.

  • Week 1 · Kickoff & access. Contracts, kickoff call, working channels. Access to CMS, analytics, GSC, schema paths, CRM. NDA + DPA if required.
  • Week 1–2 · Month 0 Baseline Audit. Prompt mining, citation-position mapping across all five engines, retrieval diagnosis, schema review. Five-day turnaround, founder-delivered.
  • Week 2 · Prompt Registry v1.0. Audit prompt-set expanded from 60–120 to 100–300 — the full operating registry. Versioned, structured, refresh cadence locked.
  • Week 2–3 · Schema architecture deployment. Initial structured-data deployment. JSON-LD validation. Wikidata audit and remediation plan.
  • Week 3 · Retrieval substrate audit. Reddit, Wikipedia, vertical pub, Substack gap mapping. Substrate intervention plan drafted.
  • Week 4 · Q1 Operating Plan. 90-day plan: interventions, target movements, owned-surface engineering, substrate placements. Signed off with client.
§ 02 · Months 2–6+

The monthly rhythm.

Phase spec
DURATIONMonths 2–6 (and beyond)
CADENCEMonthly + quarterly
OUTPUTCompounding citation movement

The repeating discipline. Layer 6 Operations runs on a monthly intervention cycle inside a quarterly planning cycle. We work, we measure, we tune. Citation position is a moving target — every engine updates its retrieval model on its own cadence — so the operating rhythm assumes the substrate shifts underneath us.

Monthly cycle.

  • Week 1 · Intervention sprint planning. Drawn from the Quarterly Plan. Sprint goals: which prompts to move, which surfaces to engineer, which substrate placements to pursue.
  • Weeks 1–3 · Citation engineering execution. Knowledge-page interventions, third-party authority placement, schema tuning, engine-specific calibration.
  • Week 4 · Citation telemetry & narrative. Per-engine, per-prompt measurement. Competitive benchmarking. Written interpretation — not a dashboard you interpret yourself.
  • Ongoing · Client operating sync. Weekly working session. Stand-up cadence — focused, time-boxed. Not status theatre.

Quarterly cycle.

  • Month 3, 6, 9, 12 · Prompt Registry refresh. Query landscape moves. Quarterly mining adds, retires, re-scores.
  • Month 3, 6, 9, 12 · Quarterly Operating Plan. Next 90 days planned. Lessons integrated. Priority shifts negotiated.
  • Month 6, 12 · Quarterly Business Review. Six-monthly executive review. Citation movement, attributed pipeline, ROI narrative. With sponsoring executive.
§ 03 · Month 6+

Renewal & review.

Phase spec
DECISIONMonth 6
RENEWAL3-month tranches
OFF-RAMPAvailable either side

At the six-month mark, the engagement renews, expands, or sunsets. The minimum is six months because Layer 6 work compounds — citation position takes 90+ days to move materially. After that, the renewal cycle moves to 3-month tranches, giving both parties clean off-ramps without forcing long commitments either way.

  • Month 5 · Six-month performance review. Movement against baseline, attributed pipeline, ROI assessment. Strategic discussion of where the next six months go.
  • Month 6 · Renewal decision. Three paths — (a) renew current scope, (b) expand (typically adding Layer 7 modules), (c) sunset. Either party can sunset without cause.
  • Month 6+ if expanding · Layer 7 architecture review. Scopes the engineering work — agent-legible pages, trust signals, MCP endpoints, knowledge graph alignment.
  • Quarterly thereafter · 3-month tranches. Clear scope, renewal review at end, clean off-ramp either side.
§ 04 · Year 2+

Mature engagement.

Phase spec
ENGAGEMENT12+ months
CADENCEQuarterly + annual
SCOPELayer 6 + Layer 7 combined

Long-form engagements look different. Once Layer 6 Operations is stabilised and citation position is compounding, the work expands into Layer 7 Engineering — building the architecture that surfaces a brand to autonomous agents. This is where the compounding advantage compounds. Most agencies can't service this phase. Most clients won't get to it.

  • Continuous · Sustained Layer 6 operations. Monthly cycle continues. Position now defended and expanded rather than built from zero.
  • Quarterly · Layer 7 architecture workstreams. Knowledge graph alignment, MCP endpoint deployment, agent-legible content, machine-verifiable trust signals.
  • Annually · Annual Architecture Review. Holistic L6 + L7 review. Forward architecture decisions. Adjacent layer questions. With C-suite sponsor.
  • Continuous · Agent-surface probing. As Operator, Comet, ChatGPT Agent and successors mature, we probe how they surface clients during transaction flows. Calibration of L7 work to live agent behaviour.
Honest off-ramps

Either party can walk.

The minimum is six months because the work needs six months to show movement. After that, renewals are 3-month tranches with clean off-ramps for both sides. We don't lock clients in. We don't pursue clients we can't help.

Sunset — either party, 30 days after Month 6. No penalty, no clawback. Final telemetry report and registry handover as part of standard close-out.

Pause — by mutual agreement, hibernation not exit. Seasonal categories or restructuring: engagements can pause up to 6 months and resume without full re-onboarding.

Operate the new layers

See where you stand on Layer 6.